15381524331 Shuangqiao Industrial Zone, Tangxia Town, Ruian City, Zhejiang Province 08:30 am – 06:30 pm
IMG-LOGO

Our Courses

Installation procedure of ball cage in drive shaft

time:2020-07-13 14:33:13| Publisher: 佚名 | see: |

① Install a new small clamp and a new inner ball cage dust cover on the axle shaft, and add about 30g of grease to the new inner ball cage dust cover.

② Align the marks made on the three ball pin with the end of the half shaft, and then install the three ball pin on the half shaft.

③ Install a new snap ring into the half collar groove. Be sure to turn the snap ring in the ring groove to make sure it is fully seated.

④ As shown in the figure below, install the roller 1 onto the three ball pin 2 with its high shoulder facing outward, and pay attention to the following matters:

a. Align the mark 3 made and re install the roller to the original position of the three ball pin.

b. Fix the axle shaft vertically to prevent the roller from falling.

Install the roller onto the three ball pin

1 - roller; 2 - three ball pin; 3 - mark

⑤ Add 60-100g grease to the new cage

⑥ Install the inner cage on the axle shaft and pay attention to the following.

a. Align the marks made on the inner cage with the roller and re install the inner cage on the axle shaft.

b. Fix the half shaft so that the inner cage is upright to prevent it from falling.

⑦ Install the end of the dust cover on the axle shaft and inner ball cage, and lock the new large and small clamps of the dust cover

Contact Us

  • Address: Shuangqiao Industrial Zone, Tangxia Town, Ruian City, Zhejiang Province
  • Phone:15381524331
  • Fax: 0577-65337468
  • Email: kaikai20003@163.com
QQ在线咨询
售前咨询热线
4008-888-888
售后服务热线
158-8888-8888